Product Details:
|
Application Field: | Low Temperature Baking Product | Performance: | Low Cure Temperature |
---|---|---|---|
Cooperation Case: | Jiaxipera,embraco | Main Ingredients: | Organic Acid |
Cure Temperature: | 130-140℃ | Color: | Black. |
Highlight: | black e coat,black edp coating |
Low temperature curing Black electrophoresis paint for shock absorber and Compressor
Product Introduction :
OHT-825/OHT-825 Ultra Low temperature Black Cationic Epoxy Electrocoat, is HLS Paint (Shanghai) Co., Ltd. the ninth generation of independent research and development of electrophoretic coating. The lead, cadmium, chromium, mercury and other heavy metals, two-component aqueous dispersion resin. At the same time, inherited the characteristics of several generations of product quality, OHT-825 on galvanized steel sheet has good adaptability, almost at the bottom of all the metal material coating, such as: cold rolled steel, galvanized steel, aluminum, stainless steel plate, rubber parts, zinc and aluminum alloy plate, such as applicable.
This product features shown below:
The appearance of the coating is flat, delicate, smooth. |
Good stability of bath can adaptable for a longer updating cycle. |
The bath has strong anti-shrinkage and anti-pollution ability. |
The ability of corrosion resistance is strong, and the edge of the workpiece is good in salt spray resistance |
Main ingredients:
Curing agent: Modified low temperature curing agent |
Matrix resin: Acrylic modified epoxy resin |
Solvent: alcohol ether |
Pigment: carbon black, kaolin, antirust pigment |
Filling tank proportion and method
⑴ Bath preparation
Ratio:
Resin 1000.00 -1250.00
Paste 250.00
DI water 1000.00
Total 2250.00 -2500.00
⑵ Ripening conditions
Sample quantity: 2250~2500g
Container: 4L (Diameter 16cm)
Tank temperature: 28~32℃
Time: 24~48Hr
Mixed conditions: impeller diameter 8cm (speed 200rpm)
(3) Coating conditions
Experimental panel: phosphated cold-rolled steel plate
Tank temperature: 28-35℃
Pole ratio: A/C = 1/2 ~ 1/4
Distance of electrodes: 15cm
ED time: For full immersing 1-3 minutes ( 20 seconds soft start)
Baking conditions: (130-140)℃×(20-30)min (Keeping temperature of parts coated)
Construction equipment
Cathodic electrophoretic coating construction in the electrophoresis tank, so need to have the following equipment:
Electrophoresis tank
Circulation devices (including filter, fill the paint device)
DI water equipment
DC power supply and the power supply unit
Anode box (tube) and circulation device
Ultrafiltration device
Cleaning devices
Heat exchanging equipment
Curing device
Annex 1
Fax: 86-021-69122952